The Brief
A public washroom package clad wall-to-ceiling in pale, softly veined marble, with brass-framed frosted glass cubicle doors set flush into the stone. Silverline delivered the stone works, the joinery and the full MEP second fix.
The whole package turns on tolerance: continuous vein matching across panels, concealed cisterns and drainage, and hardware detailed so the brass reads as the only warm note in an otherwise cool room.

Delivered Scope
08 packages01Marble & stone works
02Cubicle & glass joinery
03Brass hardware
04MEP & drainage
05Sanitaryware install
06Feature lighting
07Waterproofing
08Flooring & finishes
The Gallery
26 Plates.
Building something like this?
From concept to handover, Silverline delivers hospitality-grade fit-out as a single accountable team. Tell us about your space.



